Proven Results

Case Studies

Real projects, real challenges, real outcomes. See how Mercia Industrial has delivered results for businesses across the UK.

Automotive Manufacturing Coventry
Automotive Manufacturing

Automotive Manufacturing Coventry

Coventry, West Midlands

A Tier 1 automotive supplier producing pressed steel components needed to segregate a new painting and coating line from their existing assembly operations. The...

RapidFireWall
Read case study →
Retail Distribution Warrington
Retail Distribution

Retail Distribution Warrington

Warrington, Cheshire

A major national grocery retailer needed to create a new -18 °C frozen product zone within an existing +5 °C chilled distribution centre, without decommissionin...

ThermalShield
Read case study →
Food and Beverage Leeds
Food & Beverage Manufacturing

Food and Beverage Leeds

Leeds, West Yorkshire

A premium ready meal manufacturer undergoing their annual BRCGS audit had identified a non-conformance related to the segregation of their high-care zone from t...

RapidFireWall
Read case study →
Warehouse Logistics Northampton
Warehousing & Logistics

Warehouse Logistics Northampton

Northampton, Northamptonshire

A regional 3PL operator with a 120,000 sq ft warehouse was onboarding a new retail client whose contract required dedicated, physically segregated space that co...

RapidSlider
Read case study →
NHS Sheffield
NHS Healthcare

NHS Sheffield

Sheffield, South Yorkshire

An NHS acute hospital trust needed to refurbish a 30-bed medical ward while maintaining it as a live clinical environment — relocating all 30 patients to altern...

RapidFireWall
Read case study →
Pharmaceutical Manufacturing Nottingham
Pharmaceutical Manufacturing

Pharmaceutical Manufacturing Nottingham

Nottingham, Nottinghamshire

A contract pharmaceutical manufacturer needed to create a new GDP-compliant temperature-controlled storage zone within their existing licensed warehouse, mainta...

ThermalShield
Read case study →
Aerospace Manufacturing
Aerospace Manufacturing

Aerospace Manufacturing

Bristol, South West England

An aerospace composite structures manufacturer needed to create a temperature and humidity-controlled lay-up room within their existing production hangar, maint...

ThermalShield
Read case study →
Major UK Fashion Retailer
Retail Distribution

Major UK Fashion Retailer

Milton Keynes, Buckinghamshire

A major UK fashion retailer's distribution centre needed to rapidly increase its hanging garment processing capacity by 40% in the 8 weeks before Christmas peak...

RapidSlider
Read case study →